MANILA, PHILIPPINES — President Ferdinand Marcos Jr. dismissed any possibility of returning the 2026 National Expenditure Program (NEP) to the Executive branch amid allegations of insertions and controversies surrounding flood control projects.
Marcos thumbs down return of proposed 2026 budget to Malacañang, This news data comes from:http://eq-uby-bbh-ras.redcanaco.com
Marcos, in the latest episode of his "BBM Podcast," insisted that only a “review and rewrite” of the proposed budget, particularly that of the Department of Public Works and Highways (DPWH) could be done and resubmitted to Congress.
“No, it's not a possibility. The only thing to look at is the DPWH. Unilaterally, from our end and the executive, I already instructed the DPWH to review and to rewrite the budget,” he said in reaction to calls being made by several members of the House of Representatives to return the NEP to Malacañang.

“So, we have a commitment to Congress that the rewritten DPWH budget will be submitted to them," he added.
Executive Secretary Lucas Bersamin assured the Palace’s full cooperation and rectify potential red flags Congress would raise in its budget deliberation.
Marcos thumbs down return of proposed 2026 budget to Malacañang
“If they want us to change some things, we change. We do not have objections. But the main matter here is the NEP should be the guidance not the target of Congress,” Bersamin said.
- Rubio says US warned France on Israel annexation moves
- Aggressive promos in unregulated online gambling platforms draw Filipinos — study
- President Marcos to attend 80th UN General Assembly in New York
- Bonoan resigned due to command responsibility — Marcos
- Need a pee? Japan has QR code for that
- Diokno urges Philippines to rejoin ICC to counter China's aggression
- Estrada, Villanueva tagged in flood control mess, 'SOP was 30%'
- DoJ to begin preliminary investigation into missing cockfighting enthusiasts
- Duterte lawyer cites former president's failing health, urges return to PH after ICC postpones hearing
- PH economic losses hit 100B from corruption in flood control projects